Most-Region8151 t1_jeb04t7 wrote

OK, you are going to have a trench under the walk....keep it as narrow as you can. When you are done try and block off one end with a plank..on the low side. After the plank, backfill the trench to give it support. Then from the open end start filling and tamping with whatever fits. Ram it right against that board you put in. Pack it in...repeat until you get to the top. Then pull the board and backfill.

2

Most-Region8151 t1_jakbdko wrote

Take a piece of wood the same thickness. Mark 2" on your line of cut on top of the board. Cut to the mark. Remove board, flip over and use a square to transfer the end of the kerf to the edge of the board. Do the same with the original 2" mark on top. The distance between the two lines is what you need to hold the top cut back by.

i.e. if the bottom kerf is 2 1/2" you would stop cutting 1/2" before the end. Then finish up with jig saw or whatever.

2